冷再生機(jī)施工前的準(zhǔn)備工作主要包括哪幾方面?
來(lái)源:http://www.lvuee.com/ 日期:2022-12-26 發(fā)布人:
冷再生機(jī)施工前的準(zhǔn)備工作主要包括人員準(zhǔn)備、機(jī)械準(zhǔn)備、材料準(zhǔn)備、交通協(xié)調(diào)及后勤保障。下面冷再生機(jī)出租廠家就從這幾個(gè)方面來(lái)為您講解下相關(guān)內(nèi)容吧。
The preparation before construction of the cold regeneration machine mainly includes personnel preparation, mechanical preparation, material preparation, traffic coordination and logistics support. The following cold regeneration machine rental manufacturers will explain the relevant content to you from these aspects.
(1)材料要求:水泥選用強(qiáng)度等級(jí)為32.5、初凝時(shí)間≥3h、終凝時(shí)間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥。水泥應(yīng)具有良好的工作性、低水化、高后期強(qiáng)度、耐久性、耐腐蝕性和抗裂性能。
(1) Material requirements: Portland or ordinary Portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h shall be selected. Cement shall have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
(2)機(jī)械要求:工程施工過(guò)程通過(guò)再生機(jī)組來(lái)完成,再生機(jī)組包括:冷再生主機(jī)、水泥稀漿車(chē)、平地機(jī)、壓路機(jī)等。
(2) Mechanical requirements: the project construction process is completed through the regeneration unit, which includes: cold regeneration host, cement slurry truck, grader, roller, etc.


(3)人員要求:工程技術(shù)人員及機(jī)械操作人員應(yīng)經(jīng)過(guò)冷再生培訓(xùn)并經(jīng)過(guò)考核合格后方可上崗。
(3) Personnel requirements: engineering technicians and mechanical operators shall receive cold regeneration training and pass the examination before taking up their posts.
(4)工程協(xié)調(diào):作好施工總體計(jì)劃,采取不中斷交通半幅施工,作好施工期間交通疏導(dǎo)工作,準(zhǔn)備施工作業(yè)面的遮擋。
(4) Project coordination: make the overall construction plan, take the half width construction without interrupting the traffic, do a good job of traffic dredging during the construction, and prepare for the shelter of the construction working face.
此外要知道,冷再生機(jī)施工后,等路面強(qiáng)度達(dá)到要求后,用空壓機(jī)吹凈浮灰,撒布透層油后,上面灑石屑,之后開(kāi)放交通。更多相關(guān)事宜就來(lái)我們網(wǎng)站http://www.lvuee.com進(jìn)行咨詢(xún)!
In addition, after the construction of the cold recycling machine, after the pavement strength meets the requirements, use the air compressor to blow the dust, spread the priming oil, sprinkle stone chips on it, and then open the traffic. Come to our website for more related matters http://www.lvuee.com Consult!
閱讀/ Recommended reading
- 冷再生機(jī)租賃:現(xiàn)場(chǎng)瀝青路面冷再生機(jī)用于瀝青混凝土路面的銑刨以及添加瀝青、水等材料后的舊瀝青路面的再生。 2026-01-19
- 冷再生機(jī)租賃:率、多用途助力公路基層底層穩(wěn)定土現(xiàn)場(chǎng)就地拌和作業(yè) 2026-01-16
- 冷再生機(jī)租賃:淺析冷再生技術(shù)的使用現(xiàn)狀及存在問(wèn)題 2026-01-14
- 冷再生機(jī)租賃:道路冷再生時(shí)粒徑過(guò)大該怎么處理 2026-01-13
冷再生機(jī)租賃:水泥就地冷再生施工方法
[2026-01-21]
一、施工步驟 1、 Construction steps ?。ㄒ唬┦┕?zhǔn)備 ?。?) Construction preparation 需要冷再生施工的路面要平坦,如有大...