水泥就地冷再生施工控制要點

來源:http://www.lvuee.com/ 日期:2022-06-10 發布人:
1、混合料很佳含水量現場監測辦法,一手抓起一把混合料,用力握實,然后松手讓其自由落向地面,正常會立即摔散花,里面沒有小團料。反復試驗,介于落地松散和抱團之間的臨界含水量即很佳含水量,一般比試驗單上的很佳含水量數值多1%-2%。
1. The on-site monitoring method for the moisture content of the mixture is very good. Grab a handful of mixture with one hand, hold it firmly, and then let it fall freely to the ground. Normally, flowers will be scattered immediately, and there is no small mass inside. Through repeated tests, the critical water content between the loose and agglomerated ground is the very good water content, which is generally 1%-2% more than the very good water content on the test sheet.
2、作業施工水罐車停車時一定要離開已施工或待施工水泥已攤鋪路面,以防止漏水引起的局部水大。
2. When the construction water tanker stops, it must leave the paved road surface of the cement that has been constructed or to be constructed, so as to prevent large local water caused by water leakage.
3、施工車輛停放時一定要錯開第二天的段道預工作面,以防止耽誤第二天的人工水泥攤鋪,施工車輛很好不要停放在已完成施工的路面上。防治破壞新建結構和影響后期灑水養生。
3. When parking construction vehicles, the first pre working face of the first section of the next day must be staggered to prevent delaying the artificial cement paving of the next day. Construction vehicles should not be parked on the completed road. Prevent and destroy the new structure and affect the later watering and curing.
冷再生機租賃
4、避免犯“過壓”的錯誤,即過度壓實。若達到材料的很大密實度后仍然繼續碾壓,則會破壞材料,反而降低其密實度。
4. Avoid the mistake of "overpressure", i.e. over compaction. If the rolling is continued after reaching a great compactness of the material, the material will be damaged, but its compactness will be reduced.
5、冷再生機的施工作業應該在每天下午15:00—16:00之間結束,以便后續施工能在天黑前結束。
5. The construction of the cold regenerator shall be completed between 15:00 and 16:00 every afternoon so that the subsequent construction can be completed before dark.
6、每天冷再生租賃機結束施工進行洗刀停車后,應通知操作手仔細檢查車況并更換刀頭,以免耽誤第二天的施工進度。
6. After the construction of the cold regeneration rental machine is completed every day and the tool is washed and stopped, the operator shall be notified to carefully check the vehicle condition and replace the tool head to avoid delaying the construction progress of the next day.
此外如有施工完路段,發現漏條或跳打現象,由人工在冷再生漏打的地域按比例鋪上水泥,再生機重新倒車作業重打,如是漏打的地方很小,則很小應鋪滿冷再生轉子一樣大的地方,由再生機扣刀打一下即抬起,原則就是避免多打,破壞已完成的結構。
In addition, in case of missing strips or jumping in the construction section, the cement shall be manually paved on the cold regeneration area in proportion, and the regenerator shall reverse the operation again. If the missing area is very small, it shall be paved with a place as large as the cold regeneration rotor, which shall be lifted by the regenerator after being hit with a knife. The principle is to avoid more hitting and damage to the completed structure.
冷再生機租賃廠家提醒,如果雨季施工水泥已鋪到路上,趕上下雨,視雨水大小情況,適當減少或停止冷再生機作業的供水,用振動壓路機迅速振動碾壓一遍后,如混合料沾輪情況嚴重,平地機迅速找平后停止光輪壓路機碾壓,用振動壓路機振動碾壓2遍后即可。
The rental manufacturer of the cold recycling machine reminds that if the construction cement has been paved on the road in rainy season and it rains, the water supply for the operation of the cold recycling machine shall be appropriately reduced or stopped according to the size of the rain. After the vibratory roller is used for rapid vibratory compaction, if the mixture is seriously stained with the wheel, the smooth wheel roller shall be stopped after the grader is quickly leveled, and the vibratory roller shall be used for vibratory compaction twice.
水泥就地冷再生施工控制要點相關內容便是這樣了,您可以來我們網站www.lvuee.com咨詢了解相關事項!
This is the content related to the construction control points of cement in situ cold recycling. You can visit our website at www.tclqgc Com for related matters!

閱讀/ Recommended reading

  現場瀝青路面冷再生機是一種率、多用途的施工機械。主要用于瀝青混凝土路面的銑刨以及添加瀝青、水等材料后的舊瀝青路面的再生。也可用于公路、城鄉道路、機場、碼頭、停車場等工程的...

冷再生機租賃:率、多用途助力公路基層底層穩定土現場就地拌和作業 2026-01-16
冷再生機租賃:淺析冷再生技術的使用現狀及存在問題 2026-01-14
冷再生機租賃:道路冷再生時粒徑過大該怎么處理 2026-01-13
冷再生機租賃問題解決:冷再生在施工中常見的難題 2026-01-10

產品/ Recommended products